Product Center
Support multi-functional customization
Door to door delivery, local service, engineer on-site guidance, installation, commissioning and teaching
Service telephone
15850887188High reliability: the high-frequency pipe making machine imported from Germany, eddy current automatic inspection and high-quality parts ensure the high reliability of the product;
Advanced technology: imported from the United States, advanced aluminum brazing and welding technology combining convection and radiation is adopted to ensure that the manufacturing quality of products reaches the international level;
High quality raw materials: the main raw materials of the radiator are copper, aluminum and steel produced by large manufacturers;
Sophisticated processing equipment: CNC plate shearing, CNC bending, CNC punch, all parts are die production.
Model | Water tank model | Code | Engine | Diameter(mm) | Area(㎡) |
S30-1 | LG833B.01Ⅱ.04-010 | 37117000255 | Yuchai YC6B125-T20(BB0G2) | 630 | 32 |
S50-1 | LG50CⅢ.01.04-37-000 | 37117000256 | Weichai WD10G220E21 | 810 | 42 |
S53-1 | LG853.01Ⅳ.04-37-000 | 37117000257 | Weichai WD10G220E11 | 790 | 35.5 |
S55-1 | LG855.01Ⅲ.04-37-000 | 37117000258 | Weichai WD10G220E11 | 790 | 35.5 |
S850-6 | LG850Ⅱ.01.04-37-000(ZY)(L) | 37117000262 | Weichai WD10G220E21 | 810 | 39 |
S30-2 | LG30F.01Ⅰ.04-010 | 37117000273 | Deutz TD226B-6IG15 | 600 | 34 |
S30-5 | LG833B.01Ⅰ.04-37-000(ZY) | 37117000274 | Yuchai YC6B125-T20(BB0G2) | 600 | 33.4 |
S55-2 | LG855.01Ⅵ.04-37-000 | 37117000272 | Weichai WD10G220E11 | 760 | 37.61 |
S953-1(B) | XXX | 37101000252 | - | 760 | 39.21 |
Model | Working pressure(KPa) | Type Loader | Components | Remarks | |
S30-1 | 90 | LG833B | S30-1.01 | Core welding | 1)LG833B.01Ⅱ.04 2)LG833B.01Ⅱ.04(A) |
S30-1.02 | Water supply chamber welding | ||||
S30-1.03 | Water chamber welding | ||||
S30-4.03 | Left side panel welding | ||||
S30-4.04 | Right side plate welding | ||||
S50-1 | 90 | LG50C/LG855B | S50-1.01 | Core welding | LG50CⅢ.01.04 |
S50-1.02 | Water supply chamber welding | ||||
S50-1.03 | Water chamber welding | ||||
S50-1.04 | Side plate welding | ||||
S53-1 | 90 | LG853/ZL50D | S53-1.01 | Core welding | LG853.01Ⅳ.04 |
S53-1.02 | Water supply chamber welding | ||||
S53-1.03 | Water chamber welding | ||||
S53-1.04 | Side plate welding | ||||
S55-1 | 90 | LG855 | S53-1.01 | Core welding |
|
S53-1.02 | Water supply chamber welding | ||||
S55-1.03 | Water chamber welding | ||||
S53-1.04 | Side plate welding | ||||
S850-6 | 90 | LG850/LG853B | S850-6.01 | Core welding | LG850Ⅱ.01.04(L) |
S850-6.02 | Water supply chamber welding | ||||
S53-1.03 | Water chamber welding | ||||
S850-1.04 | Side plate welding | ||||
S30-2 | 90 | LG833/LG30F | S30-2.03 | Core welding | LG30F.01Ⅰ.04-010 |
S30-2.01 | Water supply chamber welding | ||||
S30-2.02 | Water chamber welding | ||||
LG30F.01Ⅰ.04-400/500 | Right side plate welding | ||||
S30-5 | 90 | LG833B | LG833B.01Ⅰ.04-37-100(ZY) | Core welding | LG833B.01Ⅰ.04-00-000(S) LG833B.01Ⅰ.04(A) |
S30-5.01 | Water supply chamber welding | ||||
S30-2.02 | Water chamber welding | ||||
LG833B.01Ⅰ.04-400/500 | Right side plate welding | ||||
S55-2 | 90 | LG855 | S55-2.01 | Core welding | LG855.01Ⅵ.04 |
S55-2.02 | Water supply chamber welding | ||||
S55-2.03 | Water chamber welding | ||||
LG855.01Ⅵ.04-37-400/500 | Right side plate welding | ||||
S953-1(B) | 90 | - | S953-1(B).01 | Core welding | XG953-D9-00 |
S953-1(B).01 | Water supply chamber welding | ||||
S953-1(B).01 | Water chamber welding | ||||
S953-1(B).01 | Side plate welding | ||||
S953-1(B).01 | Bracket welding |
It is widely used in industrial and mining enterprises, communications, troops, ports, highways, railways, hotels, schools, shopping malls and other places. It is an ideal emergency standby power supply equipment.